UK Engineering Firm: Five Projects Delivered On Time with Zero MEP RFIs
International Client

UK Engineering Firm: Five Projects Delivered On Time with Zero MEP RFIs

A dedicated TZV MEP BIM team operating as a seamless extension of a UK engineering practice — across five live projects simultaneously.

LocationUnited Kingdom (Remote)
ServiceMEP BIM Modeling & Coordination
Scope5 Concurrent Projects, LOD 300–350
Duration4 months (ongoing)
The Challenge

What the client needed to solve

A mid-size mechanical and electrical engineering consultancy in the UK had secured five significant projects simultaneously — a combination of commercial fit-outs and residential developments — all requiring Revit MEP BIM deliverables. The firm had two Revit-competent engineers on staff, both committed to project management and design. They had neither the capacity nor the budget to hire additional in-house Revit staff on short notice, and the BIM requirements on all five projects were contractual. They needed a reliable MEP BIM team that could work to UK standards, use BIM 360, and deliver without constant supervision.

Our Solution

How The Zenith Visions delivered

The Zenith Visions assigned a dedicated three-person MEP BIM team to the engagement. After a two-day onboarding period covering the firm's Revit template, BIM 360 environment, ISO 19650 naming convention and each project's BIM Execution Plan, the team began modeling on all five projects in parallel. A weekly video coordination call with the firm's project leads replaced the need for daily oversight. Models were uploaded to BIM 360 every Friday for client review. Clash reports were generated and resolved before each fortnightly issue.

  • Dedicated 3-person MEP BIM team operating within the client's BIM 360 environment
  • ISO 19650-compliant naming and folder structure across all 5 projects
  • HVAC, plumbing, electrical and fire protection modeled to LOD 300–350
  • Weekly coordination calls replacing ad-hoc supervision overhead
  • Clash detection run fortnightly; all clashes resolved before contractor issue
  • All 5 projects delivered on contractual programme; no extensions requested
The Results

Measurable outcomes

5
concurrent projects delivered on programme
0
MEP coordination RFIs across all 5 projects
60%
lower cost vs. equivalent UK in-house BIM resource
4 mo+
ongoing engagement — all projects now extended
We were sceptical that an offshore team could meet UK BIM standards without constant hand-holding. The TZV team proved us wrong within the first two weeks. They work to ISO 19650, they know BIM 360, and they coordinate like they are sitting in our office. We have since made them a permanent extension of our team.
— Associate Director, MEP Engineering Consultancy, UK