Real projects.
Measurable results.
How The Zenith Visions has solved BIM coordination, documentation and delivery challenges for AEC teams worldwide.
Farmhouse at Indore: From 2D CAD to Permit-Ready BIM
A complete LOD 300 Architecture BIM model delivered in 12 days from legacy AutoCAD drawings — approved by the contractor without a single revision.
Read case study
4-Storey Commercial Building: 47 Clashes Resolved Before Ground Breaks
Federated Architecture + MEP BIM model that identified and resolved 47 coordination clashes before contractor mobilisation, saving ₹12L+ in variation costs.
Read case study
Zakladni Skola Praha: Historic School from Point Cloud to Revit
LOD 300 as-built model from 14-position laser scan — enabling renovation design to start 3 weeks ahead of the measured-survey alternative.
Read case study
UK Engineering Firm: 5 Projects On Time, Zero MEP RFIs
Dedicated 3-person MEP BIM team operating across 5 concurrent live projects inside the client's BIM 360 environment — at 60% of UK in-house cost.
Read case studyReady to see results like these?
Share your brief and we will respond with a scope, timeline and fixed fee within 24 hours.